Specifications include, but are not limited to: A. All installation technicians shall be trained, certified, and equipped to comply with Federal OSHA Permit Required Confined Space Regulations (29 CFR 1910.146). B. The District shall uncover and provide access to manholes. C. The bidder in calculating the unit price must include any discounts, delivery fees or surcharges, surface preparation (cleaning, debris removal, infiltration sealant and, if needed, mortar restoration), manhole lining, spark/holiday test, and mil thickness test. The unit price on each bid item must be net. D. The work consists of furnishing labor, materials, and equipment necessary for the rehabilitation of 14 manholes with a total vertical footage of 212.97’, described as: 1. MH A-02, 18.82 VF 2. MH M-01, 7.7 VF 3. MH M-02, 8.47 VF 4. MH M-03, 10.08 VF 5. MH M-04, 12.17 VF 6. MH M-05, 13.99 VF 7. MH M-06, 15.65 VF 8. MH M-07, 16.63 VF 9. MH V-01, 7.64 VF 10. MH R1-03, 21.91 VF 11. MH R1-04, 25.93 VF 12. MH R1-05, 21.18 VF 13. MH R1-06, 22.34 VF 14. MH R1-07, 10.46 VF E. The lining system coating shall be installed at a minimum thickness of 500 mil.