Specifications include, but are not limited to: The renovation to the High School totals 161,000 GSF. The existing square footage of the school is 187,630 GSF with 26,630 GSF being removed. The existing two-story building will be augmented by two outdoor courtyardsreplacing five sided classrooms that do not get natural light or ventilation. The existing Auditorium will be renovated and a new Cafeteria will be constructed. The renovation will include modifications to the existing steel structure, existing exterior wall brick repointing, new insulation added inboard of exterior walls, new exterior panelized rainscreen wall construction, new exterior windows and storefront systems, new parking lots and asphalt/concrete sidewalks, improvements to stormwater management, new interior classroom configuration, new vertical conveying systems, and new MEP/FP systems. This will be a phased, occupied building renovation and is expected to have a duration of 29 months of construction and an 11 month closeout phase.