Specifications include, but are not limited to: Project shall consist of relocating the relocating the 65' x 35' “party dock” to the new location shown on plans. As part of this relocation the contractor shall remove dock railing panels and relocate them to accommodate the new openings. In the area where the floating dock was removed the contractor shall furnish and install railing to address gap created by the "party dock" removal. The concrete "party dock" decking shall be replaced with composite decking. Upon the relocated party dock the contractor shall construct a wood frame ship store to the size and at the location shown on plans. All finishes colors hardware etc., shall be coordinated with owner. See sheets 3 and 6 for further notes. Three 20' finger docks and approximately 52' of dock extension shall be installed as shown on plans. An approximately 50' connector dock shall attach the existing fueling dock to the docks to the north. All docks shall have appropriate railing installed.