Specifications include, but are not limited to: The Work of this Contract consists of the construction of the Wading River WTP Emergency PFAS Treatment Project including, but not limited to, clearing and grubbing, grading, site piping, propane tank, stormwater best management practices, structural foundation, prefabricated metal building, break tank, booster pumps, particulate filtration, PFAS removal treatment equipment, mechanical piping and valves, instrumentation, HVAC, and electrical systems. Electrical systems include interior lighting, power feeders to HVAC systems, site conduits and wiring, interior conduits and wiring, connections to existing electrical service panels in the existing pump station, and repairs to the existing high lift pump in the existing pump station.