Specifications include, but are not limited to: When the Central Utility Plant (“CUP”) was built, in conjunction with the Development Services Building (“DSB”), it was engineered and prepared for the addition of more equipment so as to attain a full build-out in support of new buildings on the Red Soils Campus. As such, it stands ready for the addition of a chiller, a number of boilers, and another cooling tower. Currently with the County building the new Courthouse, they are ready for this equipment to be installed. Current Equipment The current equipment in the CUP is as follows: 1ea - York TK Series Chiller – 1000 ton – Model #:YKHFJBJ2-CYFS 1ea – Evapco Cooling Tower – 340 ton – Model #:AT39942 2ea – Aerco Benchmark Boiler – 2mil/btu-hr – Model#:BMK2000 This equipment is supported and made operational by the pumps and VFD’s that are part of the system. These are all controlled by and integrated into the county’s Johnson Controls Building Automation System. (BAS) New Equipment The new equipment needed to build out the CUP for support of the New Courthouse has been specified as follows: 1ea – York Magnetic Bearing Chiller – 960 ton – Model#:YMC2 1ea – Evapco Cooling Tower – 340 ton – Model#:AT39-942 2ea – Aerco Benchmark Boiler – 2mil/btu-hr – Model#:BMK2000 2ea – Riello Dual Fuel Boiler – 3mil/btu-hr – Model RTC-80 3000 In support of this new equipment will be the appropriate pumps and Variable Frequency Drives (“VFD”). Also there will be new controls being procured to allow this new equipment to be operated and controlled by our current BAS system. The equipment has been specified as it matches the CUP’s current equipment and will allow for continuity in controls, operation and maintenance.