Specifications include, but are not limited to: The City of Newport, OR (Owner) is requesting bids for the construction of the following project: BAYFRONT PARKING LOT REFURBISHMENT; The Bayfront Parking Lot Refurbishment project consists of resurfacing of three (3) existing parking lots on city-owned properties. The following are major items and approximate quantities that are required to complete the project: · Excavation of Crushed Rock Parking Lot - 35 Cubic Yards · 2" Cold Plane w/2" Level 2, ½" Dense Asphalt Concrete Overlay - 5,600 Square Feet · Level 1 Emulsion Slurry Seal - 24,500 Square Feet · Full Depth Asphalt Concrete Digouts - 625 Square Feet · Asphalt Concrete Pavement - 70 Tons · Crack Sealing Asphalt Pavement - 2,000 Lineal Feet · Furnish and Install Concrete Wheelstops - 12 Each · Remove and Replace Concrete Wheelstops - 31 Each · 4" Solid Pavement Marking