Specifications include, but are not limited to: Project will generally consist of but is not limited to site clearing, the installation of pump station package, electric and control work for the pumping station, modifications to piping within existing valve vault, 8" suction pipe, strainers and vault, approximately 48,000 linear feet of 3" force main between DSWA Sandtown Facility and the Town of Felton, force main directional bore under roadways and storm culverts with and without casing pipe, 285 linear feet of 8" gravity, force main discharge manhole, force main flushing cleanouts and manholes, air release valves, meter manhole and above ground display unit, stone pull-off areas, paved roadway restoration, driveway restoration, culvert pipe installation and all incidentals necessary to complete the construction as detailed in the Contract Documents