Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 020100 1.00 LS CONTRACTOR CONSTRUCTION STAKING / 2 025600 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 3 012340 1.00 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 4 025323 1.00 LS MOBILIZATION / 5 070626 1.00 LS MOBILIZATION (DBE) / 6 025200 1.00 LS REMOVAL OF EXISTING STRUCTURES / 7 071554 1.00 CUYD $225.000 $225.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 8 040707 1.00 LS CURING ENVIRONMENT / 9 025324 1.00 LS TRAFFIC CONTROL / 10 070580 1.00 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $295.00 Section 02 ROAD ITEMS 11 025361 1.00 LS CLEARING AND GRUBBING / 12 012410 766.00 CUYD COMMON EXCAVATION (RURAL SMALL) / 13 012420 212.00 CUYD ROCK EXCAVATION / 14 012319 1607.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) / 15 012415 1377.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 16 010114 1.00 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 17 011590 1.00 CUYD $50.000 $50.00 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) / 18 023447 100.00 LNFT GUARDRAIL, STEEL PLATE / 19 014177 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) / Section 02 Total $90.00 Section 03 AA1 GUARDRAIL END TERMINAL ALT. (SRT) 20 023448 4.00 EACH GUARDRAIL END TERMINAL (SRT) / Section 03 Total Section 04 AA2 GUARDRAIL END TERMINAL ALT. (FLEAT) 21 023410 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) /