Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 020100 1.00 LS CONTRACTOR CONSTRUCTION STAKING / 2 025600 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 3 012340 1.00 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 4 025323 1.00 LS MOBILIZATION / 6 025200 1.00 LS REMOVAL OF EXISTING STRUCTURES / 7 020001 1.00 LS $8,000.000 $8,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / 8 071554 1.00 CUYD $225.000 $225.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 9 070580 1.00 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $8,295.00 Section 02 ROAD ITEMS 10 060359 1.00 LS CLEANING EXISTING STRUCTURE / 11 012341 21.00 CUYD FOUNDATION STABILIZATION / 12 025186 63.00 CUYD GRANULAR BACKFILL (WINGWALLS) / 13 030189 33593.00 SQYD SALVAGED TOPSOIL / 14 025361 1.00 LS CLEARING AND GRUBBING / 15 012410 19527.00 CUYD COMMON EXCAVATION (RURAL SMALL) / 16 012415 11861.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 17 012420 7546.00 CUYD ROCK EXCAVATION / 18 012319 11425.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) / 19 012317 14169.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 20 010114 1.00 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 21 012083 48.60 CUYD CONCRETE (GRADE 4.0) (RCB) / 22 011899 6.40 CUYD CONCRETE (GRADE 4.0) (AE) (RCB) / 23 025100 4730.00 LBS. REINFORCING STEEL (GRADE 60) / 24 025103 3290.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) / 25 071021 30.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM / 26 050701 10.00 LNFT CROSS ROAD PIPE ( 24") (RCP) / 27 051101 4.00 LNFT CROSS ROAD PIPE ( 36") (RCP) / 28 051109 10.00 LNFT CROSS ROAD PIPE ( 36") (CSP) / 29 054601 1.00 EACH END SECTION ( 24") (RC) / 30 054701 1.00 EACH END SECTION ( 36") (RC) / 31 054702 1.00 EACH END SECTION ( 36") (CS) / 32 023456 612.50 LNFT GUARDRAIL, STEEL PLATE (MGS) / 33 070974 112.00 CUYD SLOPE PROTECTION (RIPRAP STONE) / 34 070982 28.00 CUYD BEDDING FOR SLOPE PROTECTION / 35 011590 1.00 CUYD $50.000 $50.00 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) / 36 072144 25.00 EACH RIGHT-OF-WAY SURVEY MONUMENT /