Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 020100 1.00 LS CONTRACTOR CONSTRUCTION STAKING / 2 025600 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 3 012340 1.00 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 4 025168 1.00 CUYD $60.000 $60.00 GRANULAR BACKFILL (WINGWALLS) (SET PRICE) / 5 025323 1.00 LS MOBILIZATION / 6 070626 1.00 LS MOBILIZATION (DBE) / 7 025200 1.00 LS REMOVAL OF EXISTING STRUCTURES / 8 020001 1.00 LS $8,000.000 $8,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON PART 9 071554 1.00 CUYD $225.000 $225.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 10 070580 1.00 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $8,355.00 Section 02 ROAD ITEMS 11 060359 1.00 LS CLEANING EXISTING STRUCTURE / 12 012341 47.00 CUYD FOUNDATION STABILIZATION / 13 030189 162187.00 SQYD SALVAGED TOPSOIL / 14 025361 1.00 LS CLEARING AND GRUBBING / 15 012410 51497.00 CUYD COMMON EXCAVATION (RURAL SMALL) / 16 012415 31010.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 17 012420 8786.00 CUYD ROCK EXCAVATION / 18 012319 19865.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) / 19 012317 43600.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 20 010114 1.00 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 21 012083 93.00 CUYD CONCRETE (GRADE 4.0) (RCB) / 22 025100 8960.00 LBS. REINFORCING STEEL (GRADE 60) / 23 050700 136.00 LNFT CROSS ROAD PIPE ( 24") / 24 053101 56.00 LNFT CROSS ROAD PIPE ( 5.0 SQ.FT.) (RCPHE) / 25 054600 8.00 EACH END SECTION ( 24") / 26 055101 2.00 EACH END SECTION ( 3.0 SQ.FT.) (RCHE) / 27 055151 2.00 EACH END SECTION ( 5.0 SQ.FT.) (RCHE) / 28 050775 104.00 LNFT ENTRANCE PIPE ( 24") / 29 052976 32.00 LNFT ENTRANCE PIPE ( 3.0 SQ.FT.) (RCPHE) / 30 023456 425.00 LNFT GUARDRAIL, STEEL PLATE (MGS) / 31 023449 262.75 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE / 32 080321 494.00 TON AGGREGATE DITCH LINING ( 6") / 33 070974 627.00 CUYD SLOPE PROTECTION (RIPRAP STONE) / 34 070982 164.00 CUYD BEDDING FOR SLOPE PROTECTION / 35 011590 1.00 CUYD $50.000 $50.00 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) / 36 072144 26.00 EACH RIGHT-OF-WAY SURVEY MONUMENT /