Specifications include, but are not limited to: The West Virginia Purchasing Division is soliciting bids on behalf of the Department of Environmental Protection to establish an open-end contract for pumping, hauling, and disposing of leachate from the Fayette County Landfill located near Cunard, West Virginia to the City of Oak Hill Wastewater Treatment Plant, located in Oak Hill, West Virginia; To provide for the hauling and disposal of leachate from the Fayette County Landfill to the City of Oak Hill Wastewater Treatment Plant located in Oak Hill, West Virginia, or to the nearest WVDEP approved Wastewater Treatment Plant as directed by the WVDEP; Price per 100 gallons. The Pricing Page contains a list of the Contract Items and estimated purchase volume. The estimated purchase volume for each item represents the approximate volume of anticipated purchases only. No future use of the Contract or any individual item is guaranteed or implied. The Vendor shall position the truck at the direction of the Project Manager, so the truck can be connected via a quick disconnect at the leachate discharge point. 3.1.1.2.1 The Vendor shall maintain the liquid level in the leachate pond or tank as low as possible to comply with the 30- day storage capacity requirement, as well as the zero discharge limitations in effect for the storage pond or tank. 3.1.1.2.2 The Vendor shall be responsible for opening valves, starting the pump, monitoring the level of liquid in the truck, manually stopping the pump, and closing valves. 3.1.1.2.3 For landfill meters or totalizer instrumentation installed, the WVDEP shall record and maintain data on the LCAP Server. 3.1.1.2.4 For leachate hauling and billing purposes, if the flow meter becomes inoperable, the volume per load shall be used for billing. Every truck the Vendor uses shall have the truck(s) tank volume verified within the first month of the contract award by the following procedure.