Specifications include, but are not limited to: •Pre-demolition asbestos testing has been performed. Bidder will be required toapply for NHDES approval for abatement permit.•The Contractor will include asbestos removal and disposal in the bid.•Verify Utility disconnects•Notify Dig Safe•Site Equipment and dump containers•Demolish and remove all above ground buildings, appurtenances, garbage anddebris.•Any and all building contents, if any, become the property of the contractor, with salvage value to be a consideration in the bid price.•Contractor must have adequate on site dust control and erosion measures in place.•Remove existing foundation to minimum two feet below grade.•Fill (must be non-hazardous materials), grade, loam and seed all disturbed areas.•Remove overgrowth on the parce