Specifications include, but are not limited to: . Design, renovate and/or remodel three properties with a student-center focus for living and learning. The College envisions collaborating with the awarded Design-Build team to conceptualize, develop, plan and build student housing, instructional and workspaces within the properties described in the RFP. 1.4.1 The properties are diverse in size, age, length of vacancy, as well as structural, electrical, HVAC and other renovation needs. Work may be done in tandem for cost and worktime efficiency, as to be determined by the College and Design-Build Team. 1.4.2 The Design-Builder shall diligently provide the required services, including, but not limit to: evaluation of Owner’s criteria, preliminary design, and design-builder’s proposal to reach a guaranteed maximum Contract Sum. 1.4.3 The Design-Builder shall provide and/or coordinate all necessary project management work and services including, but not limited to: architectural, engineering and related services; construction services, including built-in and owner furnished contractor installed equipment and materials (whether demolition, remodel, new construction, or any combination); quality control services, and project close-out. 1.4.4 The College is providing information to the best to their abilities and will be relying upon the expertise of the awarded Design-Build team for collaboration and guidance of the development of properties with student focus in mind. Areas of discussion are below and not all inclusive. 1.4.4.1 Design remodel plans and specifications 1.4.4.2 Emphasis will be placed on financial responsibility for all aspects and phases of the project. 1.4.4.3 Coordinate with the College Project Manager and to prepare project proposals designed to meet all permit requirements and the College’s desire for public involvement. 1.4.4.4 Coordinate with the College Project Manager the solicitation of any subcontractors and subconsultants for the project as needed. The proposer is responsible for contracting and oversight of all design and build components of the project. 1.4.4.5 UCC is committed to building energy efficient and sustainable buildings and meeting those goals for these projects is desired, if it can be accomplished within the budget. 1.4.4.6 Attend public hearings and make presentations as needed, including presentations to the UCC Project Team, City Planning Commission, County Planning Department and College Board of Education. 1.4.4.7 Prepare materials for an appeal if one is required. 1.4.4.8 Assist in development of all planning and implementation steps to comply with environmental regulations. Complete the City and County application and submittal as necessary to meet all land use requirements. 1.4.4.9 Provide and incorporate all permit conditions, all authority having jurisdiction decisions and requirements into contract documents.