Specifications include, but are not limited to: The Comprehensive Modernization of Brian & Teri Cram Middle School includes the replacement of the concrete slab on grade plaza sections, replacing the sealant at vertical masonry control joints and sealant around doors and windows; repainting the underside of metal canopies and all metal railing and entry gates; repainting the existing smooth CMU exterior walls, refinish EIFS panels, new access ladders on the roof, new 80 mil single-ply roofing overlay and replacement of Kalwal skylights; the repair and replacement of doors and hardware, plumbing, sewer lines, existing restrooms will be renovated to include new ceramic tile and plumbing fixtures; heating, ventilation and air conditioning components, exhaust fans, boilers, chillers, pumps and building automation controls; replacing audio visual components, fire alarm, intrusion control and closed-circuit television systems, network and clock intercom upgrades and the infrastructure for a future access control system.