Specifications include, but are not limited to: Complete snow plowing of the following areas on the Holyoke Community College Campus. Plowing must be completed before 7:00 a.m. Failure to complete the plowing by this time will subject the contractor to a late penalty of $500 per hour, with all time rounded to the next highest whole hour, providing reasonable notification to plow was made and/or accumulation was reached such that sufficient time existed to plow the campus with the required equipment and operators. 1. Parking lots as follows: “A,” “B,” “C,” “D,” “E,” “F,” “G,” “H,” Upper “J,” Lower “J,” MINI “J,” “K,” “L,” “M,” “N,” “O,” “P,” “Q,” “R,” “S,” “T,” and the Day Care (The Kids’ Place) facility (about 75 parking spaces). In addition, the parking lot at the Center for Health Education located at 404 Jarvis Avenue, Holyoke, MA. a. In Parking Lot “F,” the sidewalk on the West side of the lot is to be plowed by the CONTRACTOR and no portion of the sidewalk is to be used to pile snow. Also, the walkway at the South end of the “F” lot will not be used to pile snow as this walkway will be plowed by THE COLLEGE. 2. Perimeter loop road from Main Entrance, Homestead Avenue, throughout the College, including George Frost Drive, and the access road to the Day Care facility (The Kids’ Place). 3. Access road from Homestead Avenue past “Q” lot to perimeter loop road. 4. Access road and lot in front of the “F” building. 5. Access road and lot behind “E” building. 6. All fire lanes, service roads, and receiving areas. 7. Access road to Lower “J” lot. 8. Access road and lot south end of “G” building. Plowing must be done up to the curb. 9. Sidewalk from A lot to south patio stairway and from O lot to north patio stairway, including sidewalk by tennis court area. 10. Access road leading from M lot to Lot R. Walkway on the South end of Lot R to the bottom of the steps on the northeast corner of the Marieb Building. 11. Sidewalk from the Main Campus Road to the Day Care facility.