Specifications include, but are not limited to: 1. Coordination of all construction activities with the appropriate Local and State Authorities, utilities, trades, and subcontractors. 2. Attending the Pre-bid meeting, Pre-construction conference, and all required job progress and community meetings. 3. Submission of a construction schedule, sequence of construction (as described herein), list of subcontractors, and proposed source locations for off-site materials, including, but not limited to: vegetative layer and additive(s), structural fill, sand and gravel, crushed stone, stone, processed gravel, concrete, and asphalt pavement. 4. Submission of all required shop, working, interference, and record drawings, in a timely manner, to the Engineer, for review. Submission of Stormwater Pollution Prevention Plan (SWPPP). Submission of Health and Safety Plan. Submission of Dewatering Plan. 5. Perform all field engineering associated with the project work including, but not limited to: site layout and control, the establishment of vertical and horizontal site control, construction line and grade, and preparation of asbuilt CAD and PDF plans at the completion of the project. 6. Mobilization to the Site and Demobilization from the Site. 7. Providing temporary facilities, including Engineer’s and Contractor’s field offices and sanitary facilities. 8. The Contractor shall hold a pre-construction meeting with the Town of Barnstable Conservation Commission, Owner, and Engineer to review the stormwater requirements, and inspect the erosion controls and construction fencing before land disturbance commences. 9. Select demolition, including that of the 720 Main Street Pump Station. 10. Providing site security, temporary fencing, and other construction site control measures, as needed.