Specifications include, but are not limited to: The Work will consist of, but not be limited to, the following: Install and maintain temporary traffic control. Perform cold plane pavement removal. Construct asphalt concrete pavement. Install permanent pavement markings and delineation. Perform additional and incidental work as called for by the specifications and plans. The Contractor shall: Layout and set construction stakes and marks to establish the lines, grades, Slopes, Cross Sections and curve super-elevations for Roadwork to construct the Project as shown and specified, by means approved by the Engineer. Make calculations, field notes and survey drawings for the layout and control of work as are necessary to construct the Project as specified. Provide original or copies of notes, calculations and drawings as requested. Preserve survey monuments and control stations as governed by applicable law. Establish control stations as necessary to control the Project. Replace and augment control stations as necessary to control the Project. Remove and dispose of all flagging, lath, stakes and other temporary staking material after the Project is completed.