Specifications include, but are not limited to: The selected firm shall complete an Engineering Assessment (if necessary), Topographic Survey, Roadway Design and Plan Development, Hydraulic Analysis, Environmental Documentation, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Real Estate Acquisition Services if needed, Pavement Design, Geotechnical Engineering, Utility Coordination, and Construction Phase Services. Other services such as Archeological Investigations, Historical/Architectural Investigation, Wetland Mitigation, and professional public outreach and marketing services, may be included later if these work types become necessary. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item.