Specifications include, but are not limited to: The project is intended to primarily address storm runoff drainage around the Stone Building, along with various other site improvemements. Installation of new storm drainage piping, drain inlets and a trench drain will collect runoff at the front of the Stone Building and convey it around to the rear. Areas of gravel in front of the building will be paved with concrete, along with replacement of some concrete to accommodate the drainage improvements. Two bollards will be installed to protect the HVAC equipment from vehicles. A segmental retaining wall will be constructed to hold a 24" tall slope adjacent to some mechanical equipment installed last year. Disturbed lawns and areas with substandard lawns adjacent to the retaining wall will be topsoiled and sodded.