Specifications include, but are not limited to: -Demolish and dispose of the masonry stack and its foundation. -Demolish stack breech way connection to the existing boiler house structure. Provide for a "closure" of the remaining wall penetration into the boiler house. -Demolish Boiler No. 1 and legally dispose of all hazardous materials. -Disconnect/Terminate/Cap off any utilities as indicated. -Disconnect/Remove/Partially demolish any piping, conduits, platforms, access, or other materials which connect to Boiler No. 1. Remove and terminate in a safe manner such that remaining structures, piping, etc. is left in a stable (not unsafe) condition. -Remove/Move/Shift any and all other equipment/pads/etc. which may impede the removal of Boiler No. 1 materials. Items that are removed from the building shall be disposed of in a legal manner. Items to remain in the boiler house shall be left in a stable (safe) condition. -Provide for disposal of "uncontaminated" materials on the Northpoint Training Center site in specified location. All other materials to be legally disposed of offsite.