Specifications include, but are not limited to: Proposer to clean the existing track asphalt prior to installing new track surface and remove long jump, pole vault asphalt and pole vault pad. Pole Vault - Excavate 120’ x 4’ at 2’ in depth. Bring back up with ¾ minus compacted to rock grade. Concrete will be 5” thick with rebar. Pole Vault Pad – Excavate 22’ x 24’ at 2’ in depth. Bring back up with ¾ minus compacted to rock grade. Concrete will be 5” thick with rebar. Long Jump - Excavate 280’ x 4’ at 2’ in depth. Bring back up with ¾ minus aggregate compacted to rock grade. Concrete will be 5” thick with rebar. Long jump Long Jump Footing for Sand Pit -- Excavate and construct a 10’ x 24’ footing and wall at 30”. Walls and footing to include rebar.