Specifications include, but are not limited to: 2023-2024 PAVEMENT MANAGEMENT PHASE III: FULL DEPTH RECONSTRUCTION, MILL & OVERLAY. The Fairyland Parking lot shall consist of reclamation of the existing pavement, grading, resurfacing, various drainage improvements, and reconstruction of (ADA)/(AAB) pedestrian curb ramps, and pavement marking. The roadway reconstruction includes reclamation and resurfacing, reconstruction of (ADA)/(AAB) pedestrian curb ramps, HMA driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. The proposed work also includes supplying all the necessary traffic controls.