Specifications include, but are not limited to: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 At a minimum, design for construction for the following: 1.3.5.1 North Stair (refer to attached Exhibit A): 1.3.5.1.1 Repair granite steps and structure below steps as required. 1.3.5.1.2 Replace concrete walkways. 1.3.5.1.3 Conduct a structural review of the North Stair to identify any critical structural deficiencies. 1.3.5.2 South Stair (refer to attached Exhibit B): 1.3.5.2.1 Repair water infiltration, which includes exterior sealants, waterproofing (located below the granite steps and landings), skylight (located at the top landing), and interior water damage to plaster, paint, and millwork. 1.3.5.2.1.1 Repair of skylight (Brown Brothers Skylight/Vault Lights) is to include repairing framing, and painting the exterior and interior. 1.3.6 Design to include water testing. Provide as a separate line item in the proposal. 1.3.7 Field examination of the existing buildings. 1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include nonproprietary equipment and systems. 1.3.9 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal. 1.3.10 Designer shall include any and all survey work required for completion of project. 1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required. 1.3.12 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.14 Quality control during Design, Preconstruction and Construction.