Specifications include, but are not limited to: The proposed transportation improvement project includes the reconstruction of a parking lot on Walden Street (Fairyland parking lot) as well as roadway reconstruction work on several streets in the Town of Concord MA. The work associated with the Fairyland Parking lot shall consist of reclamation of the existing pavement, grading, resurfacing, various drainage improvements, and reconstruction of Americans with Disabilities Act (ADA) / Architectural Access Board (AAB) pedestrian curb ramps, and pavement marking. The installation of the electrical infrastructure will be completed by Concord Municipal Light plant (CMLP). The proposed work associated with the roadway reconstruction includes reclamation and resurfacing, reconstruction of Americans with Disabilities Act (ADA) / Architectural Access Board (AAB) pedestrian curb ramps, HMA driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. The proposed work also includes supplying all the necessary traffic controls.