Specifications include, but are not limited to: Fiber - One (1) Single-mode OSP six (6) strand Fiber o Terminated with LC ends Copper - Two (2) OSP Cat6 Lines o Terminated on MECA’s 110 Block in each data closet Conduit - 2” Conduit transition from the ground outside to ceiling transition inside both buildings with fire caulking as needed; 1. Bidder is responsible for boring from the Southeast corner of the parking control structure to the Northeast corner of the CHIHCO Exhibit Hall. 2. The fiber and copper lines should land in closet D (CC-T109) in CHIHCO and the data closet in the parking control building. 3. Bidder is responsible for the termination, testing and labeling of the cabling. 4. Bidder will be responsible for field measurements, however, for purposes of the bid please use the following: a. The overall length of the cabling is estimated at approximately 425 feet. b. The length of the bore is estimated at 335 feet as shown in Attachment B. 5. The successful Bidder is responsible for the removal, replacement, and/or installation of fire caulking to access conduit where necessary. 6. Bidder must test each strand, all terminations and connections after installation is complete to ensure appropriate functionality. 7. MECA can provide one lift for the cable pull in the exhibit hall.