Specifications include, but are not limited to: This is phase-1 of a 3-phase project. The work on phase-1 generally consists of relocating existing facilities located just south of Runway 7L/25R. Chugach will be relocating the existing facilities in this phase of the project to allow for DOT to start earth work needed to extend out Taxiway Z. During this phase we will be abandoning the 750 CONC running from SC 603 east then south to SC 587 and runningnew 750 CONC in 6” HDPE. There will also be a replacement of some single phase runs that will utilizesome existing conduit.This project is subject to the union signatory sections of Chugach’s Outside or Generation Agreementscontained in Exhibit N of the 2022-2023 Outside Electrical Line Construction Contract. Bidding is opento all contractors regardless of union signatory statuses. Contractors are not required to be signatory to acurrent collective bargaining agreement with the IBEW Local 1547 to bid on this project. The signatoryrequirement only becomes applicable to the successful bidder once a contract is awarded. The successfulbidder can comply by either establishing that: 1) it is signatory to a current collective bargainingagreement with IBEW Local 1547; 2) by executing a collective bargaining agreement with IBEW Local1547; or, 3) by executing an agreement with IBEW Local 1547 to comply with the terms and conditions set forth in the most current agreement between IBEW Local 1547 and the Alaska Chapter National Electrical Contractors Association, Inc. If the successful bidder elects the third option, the agreement will be limited to the scope of work and duration of the project