Specifications include, but are not limited to: The Work that is presented in the Bid Proposal for this Contract consists of the replacement of existing light fixtures with more energy efficient LED fixtures. The work described in this project will result in a net load reduction, the existing electrical service is assumed to be adequate for the facility and does not require an upgrade of increase in capacity from this project work. The Contractor shall conduct the Work in such a manner as to cause minimum inconvenience to pedestrians and vehicular traffic and to persons conducting commercial enterprises or residing along the route of Work. The Contractor shall not block entrances or driveways for more than three (3) hours without prior approval of the Owner’s Representative. The Contractor shall provide and maintain temporary pedestrian bridges, ramps, or culverts at entrances of adequate width and strength for the service required. All work involved in providing for construction, maintenance, and use of entrances and driveways is the responsibility of the Contractor and will not be paid for separately and will be considered incidental to the lump sum and prices contained in the Contract Documents. It is the Contractor’s responsibility to provide adjacent property owners and/or tenants with written notification of closure of access and to provide an Owner’s Representative-approved alternative access at all times for the property owners, the tenants, and the public no less than forty-eight (48) hours prior to closure.