Specifications include, but are not limited to: Perform replacement upgrade to Guensberg building’s vertical inline fire pump. Upgrade all fire & jockey pump sensing lines to meet current NFPA 20 code compliance guidelines & commissioning requirements. New testing trees to be installed on the existing fire & jockey pump controllers. (Existing Fire & Jockey Pump Controllers to be utilized w/ new pump * Install & route new drain lines to the existing floor drain. Drains include the casing relief valve & packing drip drain lines. *Replace jockey pump suction control valve w/ NFPA/UL compliant Gate-Style control valve. Pricing should include new Patterson VIP pump (or comparable), materials, labor, disposal of demoed equipment, electrical disconnect & re-connect, start-up & commissioning of new fire pump w/ manufacturer’s service representative. Commissioning & start-up documentation shall be provided upon completion. Logistics & freight will be included. Break down; 4x3 VIP VERTICAL INLINE MOTOR DRIVEN PUMP; UL-FM APPROVED CLOCKWISE ROTATION; DESIGN: 250 GPM 41 PSI 95 TDH 3520 RPM; IMPELLER PATTERN: D-5656; SUCTION-125# FLG; MOTOR/ CONTROLLER; FAC. CHOICE, 10.0 H/P, 3520 RPM, PHASE, 60 CYCLE, 460 VOLT, OPEN DRIPPROOF MOTOR, FRAME-213JPV; SOFT START UL LABELED 1.15SF; PUMP ACCESSORIES; SET S/D GAUGES, STANDARD 300LBS W/ GAUGE COCKS; ¾” CASING RELIEF VALVE, 175#; 1 3X4 CONCENTRIC DISCHARGE INCREASER DISCHARGE-125# FLG