Specifications include, but are not limited to: Work for Shawnee County includes the rehabilitation of approximately 2,675 LF of 8” and 10” sanitary sewer, pipe point repairs, full rehabilitation of 8 manholes, and partial rehabilitation of 3 manholes. The work also includes pre-CCTV inspection, Service reconnections, and bypass pumping. 1 Mobilization 1 LS; 2 Sanitary Sewer Point Repair 12 EA; 3 8" Pipe Lining (CIPP) 1,776 LF; 4 10" Pipe Lining (CIPP) 898 LF; 5 Manhole Rehabilitation (0'-6') 8 EA; 6 Manhole Rehabilitation Extra Depth 64 VF; 7 Manhole Step Removal 9 EA; 8 Manhole Ring and Cover 9 EA; 9 Manhole Grade Ring 8 EA; 10 Manhole Inside Drop 1 EA; 11 Sewer Service Reconnections 12 EA; 12 Bypass Pumping 1 LS; 13 Pre- T.V. Inspection 2,961 LF; 14 Traffic Control 1 LS; 15 Site Clearing and Restoration 1 LS; 16 Temporary Sediment and Erosion Control 1 LS ;