Specifications include, but are not limited to: Robert Garland Bridge wearing surface replacement plus other incidental work. REMOVING PAVEMENT SURFACE; REMOVING EXISTING CONCRETE WEARING SURFACE; COMMON EXCAVATION; AGGREGATE SUBBASE COURSE - GRAVEL; 12.5 MM POLYMER MODIFIED HOT MIX ASPHALT; HOT MIX ASPHALT 9.5 MM (SIDEWALKS, DRIVES, INCIDENTALS); The Work includes construction, maintenance during construction, warranty as provided in the Contract, and other incidental work. The Contractor shall be responsible for furnishing all supervision, labor, equipment, tools supplies, permanent materials and temporary materials required to perform the Work; performing construction quality control including inspection, testing and documentation; providing all required documentation at the conclusion of the project; warrantying its work; and performing all other work indicated in the Contract.