Specifications include, but are not limited to: Install approximately 2,300 lineal feet of storm and sanitary pipe, 12-inch diameter and smaller, by trenching; Install approximately 2,400 lineal feet of storm drainage pipe, 24-inch diameter, by trenching; Install approximately 48 storm inlets and 30 manholes; Replace existing 24-inch storm drainage culvert with 36-inch culvert where Spring Creek crosses SE Washington St, by trenching; Rehabilitate approximately 2,450 lineal feet of sanitary sewer pipe, 12-inch diameter and smaller, by pipe bursting; Install approximately 1,500 lineal feet of 6-inch and 8-inch water pipe, by trenching; Install approximately 16 existing water services; Install Pressure Reducing Valve (PRV) assembly and vault; Rehabilitate approximately 19,150 square yards of asphalt concrete pavement (ACP) by 3-inch grind and inlay; Reconstruct approximately 1,300 square yards of ACP in SE Edison St