Specifications include, but are not limited to: Building #2 consists of new VAV System including Rooftop Units, VAV Boxes, ductwork and piping, boilers, and pumps. The existing exhaust fans will be replaced. Also, included is a new building automation system that shall integrate with Tridium Niagara platform. Existing LED lighting shall be protected and reinstalled. New electrical circuits and miscellaneous fire alarm modifications shall be provided to new HVAC equipment. The existing electrical main switchboard, transformer, and distribution switchboard shall be replaced. Further, building #2 includes new acoustical ceilings, structural support for equipment, roof modifications, and miscellaneous architectural improvements. Building #3 consists of new VRF System and make-up air unit. The existing exhaust fans will be replaced. Also, included is a new building automation system that shall integrate with Tridium Niagara platform. Existing LED lighting shall be protected and reinstalled. New electrical circuits and miscellaneous fire alarm modifications shall be provided to new HVAC equipment. The existing electrical main panel shall be replaced. Further, building #2 includes new acoustical ceilings and miscellaneous architectural improvements.