Specifications include, but are not limited to: 4. REMOVAL, DISPOSAL AND SITE RESTORATION 4.1 The Vendor shall remove from the site and dispose of all material, debris, installation materials and adhesives in accordance with all Local, State and Federal regulations. 4.1.1 If the owner chooses to keep any of the removed items, they have first right to the material. 4.1.2 Vendors are strongly encouraged to recycle metal, concrete and any other material in order to reduce the amount of waste going to the City Landfill. 5. CONSTRUCTION REQUIREMENTS 5.1 Vendor must comply with City of Lincoln Standard Specifications for Municipal Construction and Lincoln Standard Plans (including General Provisions and Requirements, and Material and Construction Specifications) throughout the completion of the project provided they do not interfere with the other documents attached to the bid. 5.1.1 Any deviation to the Lincoln Standard Plans, Specifications, or Plans and Drawings must be addressed as part of the bid response prior to bid closing. 5.1.2 Any deviation from the Lincoln Standard Plans, Specifications or Plans and Drawings which may arise during construction must be addressed and approved by the Construction Administrator and/or Owner’s Representative prior to completion of work, with a contract amendment being issued as necessary. 5.2 The materials, products and equipment described in the bid establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. 5.2.1 Any request for substitution of the products listed must be submitted to the Purchasing Department prior to bid closing. 5.2.2 Requests for substitutions will be addressed via an addendum to all Vendors through the ebid system. 5.2.3 No substitutions will be considered after the contract award unless specifically provided for in contract documents. 5.3 The Vendor is responsible for obtaining and paying of all fees and charges associated with permits or licenses required to complete the work for this project. 5.4 Vendors will be given a location to park vehicles and stage equipment during the term of the project. 5.5 Vendor takes full responsibility for all their employees and any subcontractors who are hired to work on the project. 5.6 All work related to the construction shall be included in the lump sum amount for the bid item.