Specifications include, but are not limited to: ). Req. approx. 500 ft2 temp. signs; 2 ea. PCMS; 200 hr flaggers; 16 ea. TCS; 300 ft ped. chan. dev.; 105 ton contam. soil disp.; const. surv. work; 71 yd3 gen. exc.; 47 ft DI pipe; 3 ea. conc. inlets; 1 ea. conc. MH; 106 yd2 cold pln. pvmt. rem.; 120 ton agg. base; 34 ton ACP; 210.4 ft conc. curbs; 400 ft2 conc. islands; 890 ft2 conc. walks; 4 ea. curb ramps; 90.2 ft2 trunc. domes; 1,500 ft thermo. striping; 340 ft2 pvmt. bar; 150 ft curb marking; 54 ft2 signs; lighting poles & arms; flashing beacon install. Completion Time: April 30, 2024. Classes of Work: Either: A) Electrical, or B) the combination of 1) Earthwork and Drainage & 2) Miscellaneous Highway Appurtenances.