All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The work to be performed under this contract includes furnishing of the labor, materials and equipment for the construction of the following: a. Schedule A – Soil 1. The soil treatment consists of disposal of non-hazardous and hazardous waste, and shallow soil mixing. b. Schedule B – Surface Restoration 1. Surface restoration consists of constructing a parking lot including: asphalt, pavers, concrete sidewalk and driveway, concrete curbs and gutters, ADA ramps, retaining walls, trash enclosure, storm drainage, stormwater treatment units, signage, wheel stops, striping, landscaping, irrigation, new electrical service, lighting, and miscellaneous accessories.