Specifications include, but are not limited to: The work to be done consists of furnishing all labor, materials, equipment, tools, and incidentals as required by the Plans (Drawing Number 1148, Sheets 1 through 4), Specifications, and Contract Documents. The general items of work include clearing and grubbing; variable depth cold milling of existing pavement; paving with asphalt rubber hot mix (ARHM) and conventional asphalt concrete; miscellaneous curb and gutter removal and replacement; construction of new bulb-outs and installation of new overhead rectangular rapid flashing beacons (RRFB) at the existing crosswalk of Foothill Blvd and Union St; striping, and signage; replacement of pedestrian signal heads and pedestrian push buttons at five (5) signalized intersections; and miscellaneous appurtenant work. Clean up and leave in an operable and acceptable condition all the work and other items not mentioned that are required by the Plans and Specifications.