Specifications include, but are not limited to: Construct the T Avenue Corridor Improvements including all materials, labor and equipment necessary for installation of approximately: 190,000 CY of Grading, 47,000 SY of Subgrade Preparation, 400 TONS of Cement Treated Subgrade, 5,400 CY of 6" Modified Subbase, 10,500 SY of 9" PCC Pavement, 1,500 SY of 8" Temporary PCC or HMA Pavement, 6,100 Tons of HMA Pavement HT, 2,800 SY of PCC Shared Use Path, 500 SY of 4" or 6" PCC Sidewalk, 4,700 Tons of Granular Surfacing, 9,200 LF of Water Main, 6,800 LF of Sanitary Sewer, 7,200 LF of Storm Sewer, 72 EA of Intakes or Manholes, one Reinforced Box Culvert, traffic signalization, 10,300 LF of 2" Conduit, 19,000 LF of Fiber Optic Cable, 360 STA of pavement marking, signing, erosion control, surface restoration, and miscellaneous related work and appurtenances. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project.