Specifications include, but are not limited to: 56.00 EACH APRONS 9.10 ACRE CLEARING & GRUBBING 1.00 LUMP SUM CONSTRUCTION SURVEY 2,150.00 LINEAR FOOT CULVERT PIPE 1,492.00 SQUARE YARD DRIVES, P.C.C. 290,430.00 CUBIC YARD EMBANKMENT-IN-PLACE 391.00 SQUARE YARD ENGINEERING FABRIC 228,855.00 CUBIC YARD EXCAVATION CLASS 10 2,209.00 CUBIC YARD EXCAVATION CLASS 12 1,425.60 CUBIC YARD EXCAVATION CLASS 20 1.00 EACH FIELD LABORATORY/OFFICE 98.60 CUBIC YARD FLOWABLE MORTAR 4,177.20 CUBIC YARD GRANULAR BACKFILL 6,846.23 TON GRANULAR SHOULDERS, TYPE A 14,701.81 CUBIC YARD MODIFIED SUBBASE 135.80 ACRE MULCHING 28.30 ACRE NATIVE GRASS SEEDING 16,171.40 SQUARE YARD PAVED SHOULDERS 343.16 STATION PAVEMENT MARKINGS 32,858.50 SQUARE YARD PAVEMENT, P.C.C. 6,850.30 SQUARE YARD REMOVAL OF PVMNT/DRIVES/SDWK 217.00 TON REVETMENT 39.60 ACRE SEEDING & FERTILIZING 247.70 STATION SHOULDER CONSTRUCTION 29,422.00 LINEAR FOOT SILT FENCE 6,889.24 TON SPECIAL BACKFILL 335.00 SQUARE SPECIAL DITCH CONTROL 67.90 ACRE STABILIZING CROP, SEED & FERT. 26,645.20 LINEAR FOOT SUBDRAIN, LONGITUDINAL 849.07 TON SURFACING, CRUSHED STONE 90,102.00 CUBIC YARD TOPSOIL, STRIP/SALVAGE/SPREAD