Specifications include, but are not limited to: Task 1: Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 infeed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Reference technical specifications and drawings for more details. Task 2: Installation of Inbound Cameras. Reference technical specifications and drawings for more details. Task 3: Power Relocation at T-1; Reconfigure standby generator power at T-1 to select ticket counters and oversize conveyors to allow “trickle” operations during utility power interruption. Includes the installation of a new control panel for standalone system operation and modification of emergency stop circuits. Reference technical specifications and drawings for more details. Task 4: UPS at T-1; Run network conduit and cabling to each uninterruptible power supply (UPS) units serving the BHS (to support future SCADA capability) at T-1 and integrate into owners existing maintenance diagnostic systems software package (MDS). Reference technical specifications and drawings for more details. Task 5: T-3 Recontrol; Upgrade all BHS Supervisory Computers and Outbound PLCs at T-3. Reprogram per Owner specifications all outbound and inbound PLCs at T-3. This scope includes the installation of a new control panel as well as new device level networking for all BHS devices. Reference technical specifications and drawings for more details.