Specifications include, but are not limited to: create two trailheads and short trail segments near Sanford High School / Regional Technical Center. The result would be 3,400 feet of new 10-foot-wide trail. The physical work involves installing erosion control measures, grading and shaping the surface, rolling out permeable landscape fabric, spreading four inches of crushed material, regrading and crowning the treadway to shed water, and compacting the surface. Work Included: Erosion control, Grubbing, Grading, New, Placement of Permeable Landscape Fabric, New Gravel Surface, Compaction & Crowning Work Involved: Grubbing Brush as Needed in Work Area, Grading Existing Material, Crowned for Drainage, Placement of Permeable Landscape Fabric, Placement of Crushed Gravel for an Average of 4”x10’ wide, Graded and Compacted Maintaining Crown for Drainage. Contactor Must Provide an Allowance for Permeable Landscape Fabric.