Specifications include, but are not limited to: The Engineer shall provide the services necessary to complete the design. It is the NMDOT’s intent that the Engineer will have full latitude and complete responsibility for developing this project. The work performed by the Engineer shall be in accordance with the adopted Guidelines for Geometric & Roadway Design and Surveying. All documents shall have only imperial units including right-of-way (ROW) documents. All work accomplished under the Contract shall be in accordance with the latest edition of the NMDOT Location Study Procedures, AASHTO "A Policy on the Geometric Design of Highway and Streets, 2018 Edition": FHWA Policies; the NMDOT Survey Handbook (2000 edition); NMDOT Design Manual; AASHTO LRFD Bridge Design Specifications current edition; and other current NMDOT manuals, standards, guidelines, design directives, standard specifications and standard procedures. The Engineer shall provide services detailed under Phase I and II. The required services include but are not limited to the following: 1. Phase I-A/B Services Perform a combined Phase I-A/B Study Report considering the following: Review Existing Conditions Report Including Issues, Needs and Challenges Supplemental Survey and Mapping (Section 1.A) if needed. Preliminary Property Ownership updates if needed. Supplemental Utility Investigation, SUE Level C Anticipated, if needed Include Pertinent Transportation and Drainage Plans when applicable. Environmental Documentation and Processing Plan Agency and Stakeholder Coordination and Meetings Context Sensitive Public Involvement Plan Updates Context Sensitive Solutions Program Traffic and Safety Analysis Geotechnical Scoping Report (if applicable) Preliminary Drainage Report or Memorandum (Section 1.B) Identify and Screen Initial Alternatives Detailed Evaluation of Alternatives Conceptual Engineering Plans and Cost Estimates of Alternatives Electronic Deliverables including PDFs, CADD Files and KMZ Files