Specifications include, but are not limited to: renovating approximately 4000 square feet in the Central Sterile in the Connecticut Tower on the basement level located at UConn Health 263 Farmington Avenue, Farmington, CT. The facility is approximately 50 years old, leaving all systems, including ductwork, original to the building. There will be a full renovation of the decontamination and clean side of the Central Sterile suite, staff break room, men’s & woman’s locker room, and the creation of a new endoscope suite. The renovation includes but not limited to the following: demolition, new framing, drywall, paint, light fixtures, flooring, MEP modifications, domestic water, sanitary, sprinkler, data/telephone rough-ins, fire alarm, security rough-ins and electrical. The renovation will require working in an active/occupied clinical setting. Infection Control (ICRA) and Life Safety (ILSM) measures will need to be followed on this project