Specifications include, but are not limited to: A. Installation of approximately 263 linear feet of 16-inch Class 52 ductile iron pipe connecting existing water main located south of Bogy Run to an existing water main located west of the identified wetlands area. B. Installation of a 1.5 cy temporary sand bag cofferdam stream diversion structure from the western bank of the White Clay Creek during low flow conditions as part of Phase I. C. Dewatering in-stream construction area and install pipeline to just past the midline/centerline of the creek. D. Installation of a 1.5 cy temporary sand bag cofferdam stream diversion structure from the eastern bank of the White Clay Creek during low flow conditions as part of Phase II. E. Dewatering in-stream construction area and install pipeline between water main pipe installed in Phase I of this project and existing pipeline, tie in location shown on plans.