Specifications include, but are not limited to: The Project includes furnishing all labor, materials, and equipment necessary for the modifications of the Solids Dewatering Building to incorporate a screw press dewatering system, retrofit pumps and piping in the Digester Control Building, Sludge Thickener Building, and Sludge Mixing Building. The work includes removal of the existing Solids Dewatering Building equipment, piping and pumps; remove and replace asphalt roadway; yard piping; core-drilling; installation of new 6-inch piping, fittings, and isolation valves; installation of new screw press dewatering system; roll-off dumpsters; new LED building lighting; new pumps; HVAC; SCADA; electrical; together with related subsidiary and incidental work in accordance with the plans and specifications.