Specifications include, but are not limited to: TURF MOWING All trash must be removed before, during, and after each mowing cycle from the lawn and parking lot areas. Grass should be cut at 3” or taller, especially during drought conditions. Some locations require the grass clippings to be bagged and removed. For areas that do not require the removal of grass clippings a mulching mower is fine. Grass needs to be blown from walks and parking areas after every visit and before contractors leave the site. All elements of the lawn maintenance cycle shall be completed the same day they are started. No partial mowing will be allowed unless the weather forces delay. If rain or wet turf conditions exist, contractor shall finish the cycle as soon as favorable conditions exist. During mowing direct all mower chutes and grass clippings away from any buildings, vehicles, parking lots, outdoor air conditioners, interpretive signs, lighting or any mechanical equipment. TRIMMING OF TURF GRASS Trimmed areas are to be cut the same height as areas mowed with larger equipment. Operator must exercise extreme care when trimming around tree trunks, sign posts, light standards, buildings or any other fixed objects. Equipment must not come in contact with or cause damage to any fixed object