Specifications include, but are not limited to: The work detailed in the Inland Bays Regional Wastewater Facility (IBRWF) Phase #2B Expansion, Contract 12-17 contract documents consist of the construction of sludge handling improvements at the IBRWF. The elements of work include but are not limited to the following: conversion of an existing sludge storage lagoon to two sludge holding lagoons with geomembrane liner, construction of a new solids dewatering building, construction of a new recycle pump station, modifications to the existing plant water system and existing cake storage building and the installation and testing of pre-purchased sludge dewatering ,aeration, mixing and polymer feed system equipment. The work includes all associated structural, architectural, mechanical, electrical, utility, sitework, instrumentation and process control systems with the plant expansion.