Specifications include, but are not limited to: The demolition and renovation scope will be approximately 5,600 GSF of the existing space in University Hospital Zale Lipshy (UHZL) 3rd floor clinical laboratory. This space will require demo and removal including, but not limited to, existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, roofing, concrete slab, doors, door frames, plumbing fixtures, restroom accessories, shelving, cabinetry, fire extinguishers, all wall mounted equipment and brackets, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, chilled and hot water piping, coordination of demo for asbestos containing materials, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, security devices and equipment, electrical panels, disconnects, electrical transformers, J-boxes, plywood paneling, electrical conduit, all wiring, all switches, and telephone as shown on the drawings.