Specifications include, but are not limited to: 1,849.00 CY EXCAVATION AND EMBANKMENT 37.00 CY EXCAVATION AND BACKFILLI NG FOR PIPE TRE 76.00 TON BORROW, TYPE B 1.00 LS REMOVAL OF STRUCTURES & OBSTRUCTIONS 772.00 LF SILT FENCE 94.00 LF PERIMETER FILTER 1.00 EACH INLET SEDIMENT CONTROL, DRAINAGE INLET 6.00 EACH INLET SEDIMENT CONTROL, CURB INLET 43.00 LF TEMPORARY SLOPE DRAIN, 12" 465.00 CY BIORETENTION FACILITIES 18.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 20.00 CY GRADED AGGR. BASE COURSE, TYPE B, PATCH 1.00 TON DELAWARE NO. 2 STONE 720.00 TON DELAWARE NO. 57 STONE 154.00 TON DELAWARE NO. 8 STONE 10.00 TON WMA, SP, TY C, 160 GYRA, PG 64-22, PATCH 20.00 TON WMA, SP, TY B, 160 GYRA, PG 64-22, PATCH 135.00 TON HT-MX BIT CON &/OR COLD LAID BIT (TRM) 535.00 SYIN WARM-MIX PATCHING 36.00 LF OBSERVATION WELLS 40.00 LF REINFORCED CONCRETE PIPE, 12", CLASS IV 98.00 LF REINFORCED CONCRETE PIPE, 15", CLASS IV 104.00 LF PVC PIPE, 4" 54.00 LF PVC PIPE, 6" 104.00 LF PORTLAND CEMENT CONCRETE CURB, TYPE 1-8 39.00 EACH P.C.C. PARKING BUMPER 15.00 EACH REMOVE AND RESET P.C.C. PARKING BUMPER 1,050.00 SF P.C.C. SIDEWALK, 6" 2.00 EACH DRAINAGE INLET, 34" X 24" 625.00 SF CELLULAR CONFINEMENT SHOULDER PROTECTION 622.00 SY GEOTEXTILES, SEPARATION 605.00 LF PERFORATED PIPE UNDERDRAINS, 4" 25.00 LF PERFORATED PIPE UNDERDRAINS, 8" 1,550.00 SY GEOTEXTILE FILTER 29.00 EACH BOLLARD 1,945.00 SY TOPSOIL (4" DEPTH) 1,973.00 SY PERMANENT GRASS SEEDING, DRY GROUND 1.00 LS PLANTINGS 1.00 EACH TREE REMOVAL 11" TO 14.9" 1.00 LS MAINTENANCE OF TRAFFIC 32.00 HOUR FLAGGER, NEW CASTLE COUNTY 1,251.00 LF PAINTING OF WHITE OR YELLOW, 4" LINE 30.00 SF PAINTING OF WHITE OR YELLOW, SYMBOL/LEGE 606.00 SF REMOVAL OF PAVEMENT STRIPING 285.00 SY REMOVAL EXIST. PCC PAV'T CURB SIDEWALK 2,292.00 LF SAW CUTTING, HOT MIX 16.00 LF SAW CUTTING, CONCRETE (FULL DEPTH) 1.00 LS INITIAL EXPENSE 1.00 LS CONSTRUCTION ENGINEERING 6.00 EACH SIGN