Specifications include, but are not limited to: 1.00 LS CLEARING AND GRUBBING 12,300.00 CY EXCAVATION AND EMBANKMENT 400.00 CY EXCAVATION AND BACKFILLI NG FOR PIPE TRE 1.50 CY FLOWABLE FILL 2,600.00 CY BORROW, TYPE A 1,000.00 CY BORROW, TYPE F 320.00 CY FURN BOR TY C FOR PIPE UTLTY TREN & STR 1.00 LS REMOVAL OF STRUCTURES & OBSTRUCTIONS 520.00 CY UNDERCUT EXCAVATION 4,800.00 LF SILT FENCE 38.00 EACH INLET SEDIMENT CONTROL, AT GRADE INLET 2.50 TON STONE CHECK DAM 3,444.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 21.00 TON DELAWARE NO. 3 STONE 1,100.00 TON WMA, SP, TY C, 160 GYRA, PG 76-22 (CARBO 2,258.00 TON WMA, SP, TY B, 160 GYRA, PG 76-22 4,505.00 TON WMA, SP, BCBC, 160 GYRA, PG 64-22 6,320.10 TON WMA, SP, TY C, 160 GYRA, PG 76-22, (NON- 25.00 TON HT-MX BIT CON &/OR COLD LAID BIT (TRM) 25.00 SY PATCHING P.C.C. PAVEMENT, 6' TO 15', TYP 1,069.00 LF REINFORCED CONCRETE PIPE, 15", CLASS IV 908.00 LF REINFORCED CONCRETE PIPE, 18", CLASS IV 304.00 LF REINFORCED CONCRETE PIPE, 24", CLASS IV 42.00 LF REINFORCED CONCRETE PIPE, 18", CLASS V 85.00 LF REINFORCED CONCRETE PIPE, 15", CLASS V 128.00 LF REINFORCED CONCRETE PIPE, 21", CLASS IV