Specifications include, but are not limited to: 1.00 LS CLEARING AND GRUBBING 2,317.00 CY EXCAVATION AND EMBANKMENT 2.00 EACH SETTLEMENT PLATFORM 1,454.00 CY EXCAVATION AND BACKFILL FOR STRUCTURES 1,214.00 CY FLOWABLE FILL 2,015.00 CY BORROW, TYPE A 4,119.00 CY BORROW, TYPE C 5,731.00 CY BORROW, TYPE F 1,912.00 CY FURN BOR TY C FOR PIPE UTLTY TREN & STR 1.00 LS REMOVAL OF STRUCTURES & OBSTRUCTIONS 23.00 CY SEDIMENT REMOVAL 436.00 LF SILT FENCE 7.00 EACH INLET SEDIMENT CONTROL, DRAINAGE INLET 3.00 EACH INLET SEDIMENT CONTROL, AT GRADE INLET 45.00 CY SEDIMENT TRAP 130.00 LF TEMPORARY SWALE, TYPE A-1 100.00 LF TEMPORARY SLOPE DRAIN, 18" 158.00 TON STABILIZED CONSTRUCTION ENTRANCE 798.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 89.00 TON DELAWARE NO. 3 STONE 102.00 TON WMA, SP, TY C, 160 GYRA., PG 64-22 (CARB 44.00 TON WMA, SP, TY B, 160 GYRA, PG 64-22 731.00 TON WMA, SP, TY B, 160 GYRA, PG 76-22 732.00 TON WMA, SP, BCBC, 160 GYRA, PG 64-22 31.00 TON WMA, SP, TY C, 160 GYRA, PG 64-22, PATCH 92.00 TON WMA, SP, TY B, 160 GYRA, PG 64-22, PATCH